The second and third-phase production of glass insulator
2012-11-15
This project is divided into three phases to build. The first phase is to build one kiln and one production line, and the second phase is to build one kiln and two production lines, and the third phase is to newly build one kiln and two production lines.
-
3 million sets/annual optronics
2012-11-15
This project plans to cover an area of 3.33 hectares with a building area 20,000 square meters, and it mainly builds production workshop, warehouse and various ancillary facilities.
-
Digital water conservancy engineering equipment
2012-11-15
This project plans to cover an area of 66.7 hectares with a building area of 400,000 square meters.
-
150sets/annual vertical pressure filter
2012-11-15
This project plans to build steel structure plant workshop and open-air cross, and newly increase production building area of 30,120 square meters as well.
-
6,000sets/annual digital automation numerical control machine
2012-11-15
This project plans to cover an area of 6 hectares with a building area of 45,000 square meters, and build facilities including workshop, office building and warehouse.
-
20,000sets/annual heavy-duty machinery reducer
2012-11-15
This project plans to build two production lines for special engineering heavy-duty machinery reducer such as engineering excavator, crane and mixer, and four production lines for high-end excavator.
-
Project toward producing 300,000sets/annual light, medium and heavy-duty auto driving axle
2012-11-15
This project plans to cover an area of 300 Chinese acres with a building area of 110,000 square meters.