Beverage company puts production at full speed

cngy.gov.cn/en | Updated: September 7, 2022
1 2 4

At the fruit-flavored beverage production workshop of Sichuan Bailonghu Beverage Co in Shilong industrial park, Guangyuan, Sichuan province, production is running at full capacity.

微信图片_20220916174448.jpg

A staff member of Sichuan Bailonghu Beverage Co checks the production line on Sept 6. [Photo/share.gyxww.cn]

"Our manufacturing shop suspended the production for 10 days because of high temperature in August. Until the beginning of September, the two production lines of the manufacturing shop resumed production," said Long Haijun, director of the manufacturing shop of the company.

Bailonghu Beverage Co settled down in Shilong industrial park in 2019. To meet the demand of consumers of all ages, the company introduced  fruit-flavored soda drinks in March. They were put into production in August.

"After resuming production, we have completed 85 percent of total order volume and expected to be fully completed on Sept 9," Long said.

At present, the company has built three production lines with per hour output of 24,000 bottles of soda drinks, one production line with per hour output of 24,000 bottles of fruit-flavored drink and one production line with per hour output of 1,500 barrels of water, providing 150 job opportunities.


Copyright © Guangyuan City, Sichuan Province. All right reserved.
Presented by China Daily.