search
close
nav search

Key section of Hezhou-Gaolan Port Expressway paved

(cityofzhuhai.com)

Updated: 2020-10-12

The Hezhou-Gaolan Port Expressway section between the Jiangmen-Zhuhai Expressway and East Airport Road was connected end-to-end over 8.7 km (5.4 miles) Oct 9 and will open to traffic next month.

Asphalt has been placed from Hezhou South Interchange at South Hezhou Reclamation Area in Jinwan District to Zhuhai Avenue and will progress farther to the Jiangmen-Zhuhai Expressway in Segment I, while the road surface of Segment II is prepared.

1.jpg

Paving of Hezhou South Interchange has been completed [Photo by Chen Xinnian / Guanhai App]

Investment, manpower, and equipment have been increased to ensure the opening is on schedule despite a two-month delay in the first quarter of this year due to the COVID-19 outbreak, according to Zhu Runtian, general manager of Hezhou-Gaolan Port Expressway.

Also known as the west extension line of the Hong Kong-Zhuhai-Macao Bridge, the 35-km (22-mile) expressway is being constructed in two phases. Its first phase runs 18 km (11 miles) from the Jiangmen-Zhuhai Expressway in Baijiao Town of Doumen District to the Airport Expressway in Jinwan's Dalin Town. Interchanges are being built at Hezhou North and South, Baiteng, Hongqi, and Zhuhai (Jinwan) Airport.

The 16-km (10-mile) second phase will run from Dalin Town to the Gaolan Port Expressway and connect to the Huangmao Sea Channel Bridge, which is under construction between southwest Zhuhai and southeast Jiangmen. It will have interchanges at Nanshui and Gaolan as well as a service area.

Designed with a speed limit of 100 kmph (62 mph), the dual six-lane expressway will cut to 30 minutes travel time between Xiangzhou District and the Gaolan Port Economic Zone. Jiangmen and western Guangdong will also be reachable within an hour.

 

 


Related

2020-03-02

Hezhou-Gaolan Port Expressway headway resumes

Roadwork on the 35-km Hezhou-Gaolan Port Expressway got back underway on Feb 19 and, by the end of this year, the section between Hezhou North Interchange and East Airport Road will open.

2020-08-25

Expressway bridge smartly raised over Zhuhai Ave

The Hezhou-Gaolan Port Expressway bridge over Zhuhai Avenue was connected end-to-end on Aug 20 after a short construction period, high risks, and complex environment had been overcome.

2020-09-10

Baiteng River expressway bridge ready by November

The structure of a vital bridge along the Honghe Bridge-East Airport Road first-phase section of the Hezhou-Gaolan Port Expressway was completed Sept 7.

Join in

64a9430a184ed00c2f309e22.jpg Moving 'Qingming Festival by the Riverside' on exhibition in Zhuhai

Piquing Interest

`.jpg Zhuhai islands aim high in tourism

Living Here

1.jpg Hong Kong-Macao residents guided into living in Zhuhai
Copyright © Zhuhai Municipal Government. All rights reserved. Presented by China Daily. 京ICP备13028878号-22